EPSA urges PJM to consider measured and appropriate market design reforms to establish a durable market structure that remains resilient in the face of changing external factors, pressures, and inputs in the long term.
Read More
EPSA and P3 Letter to PJM Board Opposing Consumer Advocates’ Request for Fast-track Process on RMRs
The Electric Power Supply Association (EPSA) and the PJM Power Providers Group (P3) wrote to the PJM Interconnection Board requesting them to maintain the current Relibility Must Run (RMR) approach noting it is critical to maintain electric system reliability.
Read MoreEPSA filed comments on ISO-NE's MOPR Removal and Transition Mechanism Filing. Docket No. ER22-1528
EPSA filed comments on ISO-NE’s MOPR removal and transition mechanism filing.
Read MoreEPSA Letter to PJM: Capacity Market Workshop – Session 6
EPSA submitted the letter to PJM for consideration as part of the June 4 Capacity Market Workshop Session 6 discussion regarding issue scoping and timing/sequencing for Phase II (“Beyond MOPR”) capacity market reforms that may be necessary.
Read MoreEPSA Submits Capacity Market Workshop Comments to PJM With Guiding Principles on Capacity Markets
EPSA and its member companies have been actively engaged at every phase of the development and refinement of the PJM capacity market since its inception. We do agree with PJM that the discussion should be advanced at this time. Accordingly, to assist PJM and stakeholders with consideration of the issues, EPSA has developed several guiding principles on capacity markets that possible enhancement should be built on.
Read MoreEPSA Letter to PJM Urging Delayed Base Residual Auctions Move Forward
EPSA Letter to PJM Urging Delayed Base Residual Auctions Move Forward
Read More
