In comments on a complaint filed by Constellation to address “fully isolated co-located load” scenarios in PJM, EPSA and P3 agree with the urgency indicated by the complaint and urge FERC and PJM to craft a near-term approach that achieves the needed clarity sought by Constellation and needed by other generation resources and large load end-users.
Date: December 12, 2024
Venue: Federal Energy Regulatory Commission
Proceeding: Constellation Energy Generation v. PJM Colocation Complaint, Docket EL25-20-000
Summary: The Electric Power Supply Association and the PJM Power Providers Group (P3) filed joint comments in the complaint proceeding initiated by Constellation Energy Generation against PJM seeking changes to the PJM Tariff to specify rules for Fully Isolated Co-Located Load, a situation in which interconnected generators and end-use load are co-located behind the meter in a manner that includes protective relays to prevent the load from receiving power from the grid. EPSA and P3 agree with Constellation that clear rules and policy guidance are needed to address current barriers to the array of co-located load arrangements in PJM. Thus, the groups urge the Commission to accept the Complaint and direct the development of needed relief on an expedited basis for PJM. These co-location arrangements – bilateral supply configurations that support swiftly emerging and important economic and national security facilities – represent the innovation that competitive markets foster and support. Those opportunities should not be thwarted by anti-competitive actions or confusion over the rules of the road. Importantly, guidance must be flexible enough to avoid erecting barriers to, or discriminating against, co-located load or generation.