• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electric Power Supply Association

  • Insights
  • Podcast
  • About EPSA
    • Policy Principles
    • EPSA Members
    • Our Staff
    • Careers
  • For Members
    • Join EPSA
    • Committees
  • Contact
  • FAQ
EPSA

EPSA

  • Newsroom
    • Media Contacts
    • Press Releases
    • PowerFacts
    • Factsheets and White Papers
    • Power Moves Newsletter
    • Opinion and Commentary
    • Social Media
    • Podcast
  • Policy & Advocacy
    • Policy Positions
    • Federal Energy Regulatory Commission
    • Federal
    • Judiciary
    • State
    • ISOs/RTOs
  • Power Facts
    • Rising Power Demand
    • Reliable Power
    • Energy Cost Savings
    • Environmental Progress
    • Energy Innovation
    • In Your State
  • Understanding Your Electric Bill
Home / Regulatory & Policy / EPSA and P3 Support Need for Expedited Rules of the Road for Co-Location Arrangements

December 12, 2024

EPSA and P3 Support Need for Expedited Rules of the Road for Co-Location Arrangements

By EPSA

In comments on a complaint filed by Constellation to address “fully isolated co-located load” scenarios in PJM, EPSA and P3 agree with the urgency indicated by the complaint and urge FERC and PJM to craft a near-term approach that achieves the needed clarity sought by Constellation and needed by other generation resources and large load end-users.

Date: December 12, 2024

Venue: Federal Energy Regulatory Commission

Proceeding: Constellation Energy Generation v. PJM Colocation Complaint, Docket EL25-20-000

Summary: The Electric Power Supply Association and the PJM Power Providers Group (P3) filed joint comments in the complaint proceeding initiated by Constellation Energy Generation against PJM seeking changes to the PJM Tariff to specify rules for Fully Isolated Co-Located Load, a situation in which interconnected generators and end-use load are co-located behind the meter in a manner that includes protective relays to prevent the load from receiving power from the grid. EPSA and P3 agree with Constellation that clear rules and policy guidance are needed to address current barriers to the array of co-located load arrangements in PJM. Thus, the groups urge the Commission to accept the Complaint and direct the development of needed relief on an expedited basis for PJM. These co-location arrangements – bilateral supply configurations that support swiftly emerging and important economic and national security facilities – represent the innovation that competitive markets foster and support. Those opportunities should not be thwarted by anti-competitive actions or confusion over the rules of the road. Importantly, guidance must be flexible enough to avoid erecting barriers to, or discriminating against, co-located load or generation.

Primary Sidebar

Download PDF

Share

Home Page Help Area

Sign up for EPSA’s Power Moves newsletter – a monthly update on the road to a reliable energy future that works for all Americans.

LEARN MORE

Footer

1401 New York Ave. NW
Suite 950
Washington, DC 20005

p 202.628.8200
f 202.628.8260

  • Facebook
  • LinkedIn
  • Twitter
  • Home
  • About EPSA
  • Filings
  • Newsroom
  • For Members
  • Contact
  • PowerFacts
  • FAQ

Copyright © 2026