• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electric Power Supply Association

  • Insights
  • Podcast
  • About EPSA
    • Policy Principles
    • EPSA Members
    • Our Staff
    • Careers
  • For Members
    • Join EPSA
    • Committees
  • Contact
  • FAQ
EPSA

EPSA

  • Newsroom
    • Media Contacts
    • Press Releases
    • PowerFacts
    • Factsheets and White Papers
    • Power Moves Newsletter
    • Opinion and Commentary
    • Social Media
    • Podcast
  • Policy & Advocacy
    • Policy Positions
    • Federal Energy Regulatory Commission
    • Federal
    • Judiciary
    • State
    • ISOs/RTOs
  • Power Facts
    • Rising Power Demand
    • Reliable Power
    • Energy Cost Savings
    • Environmental Progress
    • Energy Innovation
    • In Your State
  • Understanding Your Electric Bill
Home / Regulatory & Policy / EPSA Answers Certain Comments in PJM Capacity Market Adjustments Proceeding

January 21, 2025

EPSA Answers Certain Comments in PJM Capacity Market Adjustments Proceeding

By Bill Zuretti

EPSA points out comments in this proceeding which stray far from PJM’s proposal to revise aspects of its capacity market auction construct. EPSA urges the Commission to act on PJM’s proposals and reject any proposal that would cause further delays for the next auction.

Date:              January 21, 2025

Venue:          Federal Energy Regulatory Commission

Docket:         ER25-682-000, PJM Interconnection

Summary:  On January 21, 2025, the Electric Power Supply Association (EPSA) filed an answer at FERC to respond to comments filed by three PJM utilities (FirstEnergy, Duquesne and PPL) and several “complainant” parties who have filed separate complaints at the Commission on reforms to PJM’s capacity market auction construct. In particular, the utilities offer recommendations that stray far beyond the scope of the PJM Capacity Market Adjustments (CMA) proceeding. Rather than addressing any aspect of PJM’s proposal, the utilities instead urge the Commission to convene technical conferences to address issues outside the scope of the instant proceeding and, importantly, well outside the scope of the Commission’s authority. Regarding comments from several complainant parties, each attempts to forward its own “remedies” to PJM’s acknowledged resource adequacy and reliability challenges and thus intrude in this docket to either tie their preferred solutions to PJM’s CMA proposals or to hitch their complaints to the statutory clock mandating action on the December 9 Filing within a 60-day period. The Commission should act expeditiously to assess PJM’s proposals and reject any proposal that would result in further delays.

Primary Sidebar

Download PDF

Share

Home Page Help Area

Sign up for EPSA’s Power Moves newsletter – a monthly update on the road to a reliable energy future that works for all Americans.

LEARN MORE

Footer

1401 New York Ave. NW
Suite 950
Washington, DC 20005

p 202.628.8200
f 202.628.8260

  • Facebook
  • LinkedIn
  • Twitter
  • Home
  • About EPSA
  • Filings
  • Newsroom
  • For Members
  • Contact
  • PowerFacts
  • FAQ

Copyright © 2026