• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electric Power Supply Association

  • Insights
  • Podcast
  • About EPSA
    • Policy Principles
    • EPSA Members
    • Our Staff
    • Careers
  • For Members
    • Join EPSA
    • Committees
  • Contact
  • FAQ
EPSA

EPSA

  • Newsroom
    • Media Contacts
    • Press Releases
    • PowerFacts
    • Factsheets and White Papers
    • Power Moves Newsletter
    • Opinion and Commentary
    • Social Media
    • Podcast
  • Policy & Advocacy
    • Policy Positions
    • Federal Energy Regulatory Commission
    • Federal
    • Judiciary
    • State
    • ISOs/RTOs
  • Power Facts
    • Rising Power Demand
    • Reliable Power
    • Energy Cost Savings
    • Environmental Progress
    • Energy Innovation
    • In Your State
  • Understanding Your Electric Bill
Home / Regulatory & Policy / EPSA Protests PJM Interim Resource Adequacy Service Proposal

September 4, 2026

EPSA Protests PJM Interim Resource Adequacy Service Proposal

By EPSA

EPSA raises concerns that PJM’s proposed IRAS framework would unduly discriminate between new and existing capacity resources, distort capacity market signals, and undermine reliability and competition.

Date: September 3, 2026 | Venue: Federal Energy Regulatory Commission | Docket: ER26-3515-000

On September 3, 2026, the Electric Power Supply Association filed a protest at FERC in response to PJM’s proposal to establish an Interim Resource Adequacy Service (IRAS) and Large Load Registry to address resource adequacy concerns and growing large load demand in the region. While EPSA supports efforts to address PJM’s capacity shortfall and reliability challenges and does not oppose the proposed Large Load Registry, the protest explains that the IRAS proposal would undermine reliability and competition by creating unduly discriminatory and preferential treatment between new and existing capacity resources.

EPSA raises particular concerns with PJM’s proposed “Bring Your Own New Capacity” (BYONC) requirement, which would require New Large Loads to contract with new capacity to avoid IRAS and potential curtailment, effectively preventing existing capacity resources from competing to serve New Large Loads. EPSA explains that the proposal would distort capacity market price signals, disadvantage existing resources, increase costs to consumers over time, and undermine investor confidence in PJM’s market design. As an alternative, EPSA identifies an approach that would require capacity-deficient load-serving entities to designate load, or contracted demand response, for curtailment during load-shed events, incenting sufficient capacity procurement while preserving the integrity of PJM’s Reliability Pricing Model and avoiding discrimination against existing resources.

Primary Sidebar

Download PDF

Share

Home Page Help Area

Sign up for EPSA’s Power Moves newsletter – a monthly update on the road to a reliable energy future that works for all Americans.

LEARN MORE

Footer

1401 New York Ave. NW
Suite 950
Washington, DC 20005

p 202.628.8200
f 202.628.8260

  • Facebook
  • LinkedIn
  • Twitter
  • Home
  • About EPSA
  • Filings
  • Newsroom
  • For Members
  • Contact
  • PowerFacts
  • FAQ

Copyright © 2026