• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Electric Power Supply Association

  • Insights
  • Podcast
  • About EPSA
    • Policy Principles
    • EPSA Members
    • Our Staff
    • Careers
  • For Members
    • Join EPSA
    • Committees
  • Contact
  • FAQ
EPSA

EPSA

  • Newsroom
    • Media Contacts
    • Press Releases
    • PowerFacts
    • Factsheets and White Papers
    • Power Moves Newsletter
    • Opinion and Commentary
    • Social Media
    • Podcast
  • Policy & Advocacy
    • Policy Positions
    • Federal Energy Regulatory Commission
    • Federal
    • Judiciary
    • State
    • ISOs/RTOs
  • Power Facts
    • Rising Power Demand
    • Reliable Power
    • Energy Cost Savings
    • Environmental Progress
    • Energy Innovation
    • In Your State
  • Understanding Your Electric Bill
Home / Regulatory & Policy / EPSA Urges FERC to Initiate Rulemaking to Prohibit Junk and Jewel Interstate Pipeline Capacity Allocation Practice

June 27, 2024

EPSA Urges FERC to Initiate Rulemaking to Prohibit Junk and Jewel Interstate Pipeline Capacity Allocation Practice

By EPSA

Date: June 27, 2024

Venue: Federal Energy Regulatory Commission

Case: Docket No. RM22-17-000

Summary: In comments to the Federal Energy Regulatory Commission (FERC), EPSA highlights concerns with the current practice of interstate natural gas pipelines to package non-contiguous and/or operationally unrelated capacity segments as one product in one auction or open season in order for the pipeline to determine the highest value bid to allocate the capacity. The practice is known as “junk and jewel,” and can result in higher consumer costs and reduced electric reliability.

As end-users reliant on pipeline delivery of natural gas to produce electricity, gas-fired generators urge the Commission to initiate a rulemaking to adopt a rule that prohibits the aggregation (i.e., tying) of high value capacity segments with low or no value segments in order to artificially elevate rates for the package.

Key Points:

  • The “Junk and Jewel” practice artificially inflates pipeline capacity bids and creates excessive costs for consumers.
  • Power system reliability depends on the availability and delivery of natural gas to gas-fired generators.

The Commission opened a Notice of Inquiry to seek additional information following a June 2022 Petition for Rulemaking submitted by a group of trade associations representing major pipeline shippers (producers, gas distribution utilities, public gas companies, and process gas consumers).

Primary Sidebar

Download PDF

Share

Home Page Help Area

Sign up for EPSA’s Power Moves newsletter – a monthly update on the road to a reliable energy future that works for all Americans.

LEARN MORE

Footer

1401 New York Ave. NW
Suite 950
Washington, DC 20005

p 202.628.8200
f 202.628.8260

  • Facebook
  • LinkedIn
  • Twitter
  • Home
  • About EPSA
  • Filings
  • Newsroom
  • For Members
  • Contact
  • PowerFacts
  • FAQ

Copyright © 2026