The Exelon utilities’ responses to FERC attempting to support their proposed new co-location rate schedules do not change or rectify the infirmities of the filings. They should therefore be rejected and, instead, the Commission should utilize an expedited, time-limited mechanism to provide needed short-term guidance on emerging co-location issues.
Date: January 10, 2025
Venue: Federal Energy Regulatory Commission
Proceeding: Exelon Utilities’ Proposed PJM Co-Location Rate Schedules, Dockets ER24-2888, et al.
Title: EPSA Urges FERC to Reject Exelon Utilities’ Proposed Co-Location Tariffs
Summary: The Electric Power Supply Association filed comments at FERC protesting the Exelon utilities’ proposed revisions to the PJM Tariff with respect to the treatment of co-location of large loads with generation. The utilities submitted responses to questions posed by the Commission in a November deficiency letter but the answers do not cure the array of concerns raised by close to twenty parties that have already commented in this proceeding. The anti-competitive and discriminatory proposed Tariff revisions should be rejected.
Instead, the Commission should address the clarity and a level of certainty that industry needs in the short term to facilitate these co-location scenarios (and clear up the confusion created by an array of pending proceedings, including the Exelon rate schedules). Importantly guidance from FERC must be flexible enough to avoid erecting barriers to, or discriminating against, co-located load or generation.