Winter storms, increased demand, resource retirements, infrastructure constraints, and other mounting pressures on electric power supply have presented challenges to power system reliability in recent years. EPSA and its member companies continue their ongoing effort to analyze and address past extreme weather events, lessons learned, and next steps to improve access to essential natural gas power generation resources during all weather conditions.
Commitment to Reliability
EPSA and its member companies have long been and remain committed to providing reliable electricity and improving power generation operations. EPSA member companies work every day to ensure that their generation resources and facilities are prepared to operate reliably and when needed. They have invested millions of dollars and significant resources to that end.
Industry in Action
As an association, EPSA advocates tirelessly to promote cost-effective reliability solutions at ISOs/RTOs and in policy and regulatory arenas and to point out policies or regulatory actions that may disrupt our member companies’ ability to provide reliable electricity.
Action list
- Essential gas and power industry sectors formed the Reliability Alliance to address gas-electric coordination challenges and recommend constructive, actionable approaches to improve reliability. EPSA, together with the Interstate Natural Gas Association of America and the Natural Gas Supply Association, provided nearly a dozen jointly developed recommendations for improvements to gas-electric coordination to the Federal Energy Regulatory Commission (FERC), the North American Energy Reliability Corporation (NERC), the ISO-RTO Council, individual RTOs, and the National Association of Regulatory Utility Commissioners (NARUC).
- EPSA regularly engages in FERC proceedings and other industry efforts addressing reliability concerns to provide industry expertise and workable solutions.
- EPSA and its members are active participants across the array of NERC stakeholder processes and with the Electric Reliability Organization’s leadership to address current critical reliability issues and identify solutions and pathways forward to strengthen the grid and improve reliable delivery of power to customers.
On an individual operational level, power generation owners and operators take measures to secure the system from winter weather interruptions.
- Prepare winter readiness plans well in advance of the season, starting in March and April, with a review of operations and lessons learned from the previous season, including any experience with equipment freezing.
- Train personnel on winter preparedness and readiness plans and prepare staffing plans.
- Take maintenance and assessment measures to shore up critical equipment, including but not limited to: determining the lowest temperature at which plants can reliably operate, identifying critical equipment that may be impacted by winter weather, performing and documenting annual preventative maintenance activities, and identifying needed areas of insulation.
There is no one-size-fits-all approach to winterizing power generation equipment. Facilities consider many factors, including among other things, the region in which the plant is located, the physical orientation of the facility, design of the facility, age of the facility, and the experience of the facility in prior weather events. Experience teaches that new assets need to go through weather events to identify weaknesses and allow owners to implement solutions that improve performance over time.
Experience teaches that each weather event allows facility operators to identify what worked well, along with areas for improvement based on unit performance, in order to implement changes that improve performance over time.
Natural Gas Generation Is Essential to Reliability
All resources are needed to meet rising power demand and contribute to a reliable grid. Specifically, however, natural gas-powered generation remains critical to a reliable power system and is one of the only technologies capable of producing dispatchable electricity on an as-needed basis at sufficient scale and duration. Adequate access to natural gas generation, both existing and new resources, will continue to be needed throughout the U.S. to support increased renewable integration and rising demand.
Reliability Challenges Are Not Unique to Competitive Markets
No region, market model, or generation technology is immune to extreme weather conditions. Events like 2022’s Winter Storm Elliott provide a chance to find real solutions to enhance grid reliability and the resiliency of all resources during various types of weather conditions.
While challenges and outages were experienced during Winter Storm Elliott, the PJM Interconnection market and its participants provided more than enough power to meet demand—even exporting excess power to help neighboring regions at crucial times. PJM as the system operator managed to deliver power to consumers and businesses reliably and keep the lights on. Meanwhile, as cited in the FERC-NERC report, some regions served by vertically integrated utilities and public power impacted by the storm experienced rolling blackouts and relied heavily on imports from competitive market regions to avoid further load shed.
Solutions to Enhance Grid Reliability in all Weather Conditions:
Adopting the right solutions to ensure the grid can reliably perform and deliver power is critical to ensuring that it is prepared for the next major winter storm.
The following solutions will enhance grid reliability and help keep dispatchable resources like natural gas available when customers need power:
- Ensuring that new policies and regulatory proposals do not put reliability on the back burner. Current policies and regulations are accelerating the retirement of critical dispatchable natural gas resources, which face economic challenges due to existing market design flaws and out-of-market actions.
- Investing in weatherization and system hardening, while ensuring that market mechanisms and other avenues support investments made. Owners/operators must be allowed the opportunity to recover the costs to ensure the reliable operation of facilities and should not be denied recovery for prudently incurred expenses to achieve that end.
- Engaging the natural gas supply sector and all relevant stakeholders to understand and address the challenges of gas-electric coordination. This should include improved planning and preparation by both the electric and natural gas systems. Additionally, improvements to Day Ahead notification and scheduling are needed to avoid leaning on real-time markets when gas-fired generation is going to be needed but conditions are impacting the gas system as well. Market design reforms and/or compensation mechanisms must better align the operations of these two systems during critical periods.
- Improving load forecasting in anticipation of an expected extreme weather event and utilizing situational awareness of the power and natural gas systems to inform a conservative, clear approach to notification, scheduling, and dispatch that allows generators to prepare and be available when called.
- Streamlining energy project permitting and creating predictable timelines to provide confidence for investors and increase the amount of new infrastructure being built to support reliable fuel supplies and continued emissions reductions.
- Addressing interconnection queue processes to prioritize the approval of projects that can support grid reliability.
- Continuing to incorporate lessons and tests from extreme events to build on our understanding of how infrastructure can be prepared to perform in future extreme weather scenarios.